grid-substation-logo-512
Grid substation

A 110/20 kV substation with six feeders on IEC 60870-5-104: transformer thermal margin, tap changer wear, and a full recloser sequence.

v0.1.0

どのように動作しますか

A distribution substation: 110/20 kV with six feeders, 9 devices and 69 points over IEC 60870-5-104.

Protection events are why this solution exists. The interesting data arrives in bursts rather than as a steady poll, and the demonstration is what an Edge does with a burst: capture it at the resolution it happened, not at the rate someone chose to sample.

The money moments are transformer thermal margin treated as a forecast rather than a threshold, a tap changer wear counter that accumulates towards maintenance rather than alarming after it, and a complete recloser sequence captured end to end on the wire.

grid substation 1
grid substation 2
grid substation 3
grid substation 4
grid substation 5

おすすめのソリューション

https://images.ctfassets.net/7xdd0wzmxlfo/727ywwWEtEkRF77URYLveG/00f0baae5491ce465d2bbe0ebceb223d/collection-system-thumb-1280x720.png

Nine lift stations and a treatment works on DNP3, deliberately split across two Litmus Edges managed from one Litmus Edge Manager.

https://images.ctfassets.net/7xdd0wzmxlfo/4yxE2eFCfCpUZMu2ddckIa/702deb9cbf495ccdbb9b476a460dd5e8/steel-mini-mill-thumb-1280x720.png

An electric arc furnace and a caster in one material flow over OPC UA, where a slag foam collapse sets the month billed demand charge.

https://images.ctfassets.net/7xdd0wzmxlfo/74mvkMGzDIbdKGoUe5pQuk/2582fcf4eb37350b63ba3c0e215c2721/rotating-equipment-reliability-thumb-1280x720.png

Condition monitoring across a six-machine fleet over Sparkplug B, with the bearing prognosis computed on the Edge.

すべてのソリューションを表示